Almaty, Ryskulov Avenue, 73A, office 16, 21
  kazozat777@mail.ru 

Select your language

1. The block modular pumping station is oversized with a size of 12,000*6,000 for the oil field in Zhanaozen. The pumping station has been assembled, delivered, installed and put into operation.
2. Assembly of a block modular compressor station for the production of compressed air for a customer from Uzbekistan.
3. Installation of a high- and medium-pressure gas pipeline for gas supply to the MKR school. Shooed.
4. Installation of external sewerage from chrysotile cement pipes at the school facility in the Shugyla district.
5. Calculation, manufacture, delivery and installation of a tank for a pumping station of a tailings dump at a gold mining factory.
6. Installation of an outdoor heating network at the School facility on Egizbayeva St.
     
Services | Cases | Partnership | Useful | About the company | Contacts
  ТОО «КазОзат»    Almaty, Ryskulov Avenue, 73A, office 16, 21 
  +7  (747)  930-79-96    +7  (747)  930-79-96   kazozat777@mail.ru